ITAC Assessment: SF0422
ITAC logo
ITAC Assessment: SF0422
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Salami and Specialty Italian Meats
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 75,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 4,930
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $482,744 5,771,839
kWh
Electricity Demand $257,489 12,371
kW-mo/yr
Electricity Fees $12,627 -
Natural Gas $205,822 29,805
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,257 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $3,969 - $2,381
28,484
kWh
- $1,588
-
MMBtu
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $642 $43 $450
5,378
kWh
$192
-
kW-mo/yr
- - -
03 2.2691: Shut off cooling if cold outside air will cool process $36,414 $12,500 $36,414
435,573
kWh
- - - -
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $47,040 $16,100 $47,040
562,685
kWh
- - - -
05 2.7111: Reduce illumination to minimum necessary levels $662 $228 $276
3,296
kWh
$386
-
kW-mo/yr
- - -
06 2.2437: Recover waste heat from equipment $9,464 $10,283 - - $9,464
-
MMBtu
- -
07 2.2437: Recover waste heat from equipment $2,287 $3,924 $1,538
18,396
kWh
$749
-
kW-mo/yr
- - -
08 2.7135: Install occupancy sensors $1,288 $3,390 $569
6,802
kWh
$719
-
kW-mo/yr
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $8,693 $31,027 $5,467
65,391
kWh
$2,183
-
kW-mo/yr
- $783 $260
10 4.212: Adopt in-house material generation $15,798 $22,322 - - - - $15,798
TOTAL RECOMMENDED $126,257 $99,817 $94,135
1,126,005
kWh
$4,229
-
kW-mo/yr
$11,052
-
MMBtu
$783 $16,058
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs