| Assessment Year | 2026 |
|---|---|
| Principal Product | Surfactants |
| NAICS | 325613: Surface Active Agent Manufacturing |
| SIC | 2843: Surface Active Agents, Finishing Agents, Sulfonated Oils, and Assistants |
| Sales Range | $100 M to 500M |
| # of Employees | 140 |
| Plant Area |
325,613
ft2
|
| Annual Production | 110,000,000
ton
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,724,222 | 33,464,249 |
kWh
|
$0.052 | |
| Electricity Demand | $14,405 | 1,114 |
kW-mo/yr
|
$12.93 | |
| Electricity Fees | $1,227,862 | - |
|
- | |
| Natural Gas | $3,464,413 | 625,729 |
MMBtu
|
$5.54 | |
| Waste Disposal Costs | |||||
| Water Usage | $1,344,060 | 275,773 |
Tgal
|
$4.87 | |
| TOTAL YEARLY COSTS | $7,774,962 | ||||
| RECOMMENDED SAVINGS* | $106,292 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2113: Repair or replace steam traps | $37,862 | $9,600 | - | - |
$37,862
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31,599 | $86,296 |
$20,726
398,580
kWh
|
$10,873
-
kW-mo/yr
|
- | |
| 03 | 2.7221: Lower temperature during the winter season and vice-versa | $24,568 | - |
$16,505
317,400
kWh
|
$8,063
-
kW-mo/yr
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,238 | $9,275 |
$7,636
146,842
kWh
|
$2,602
-
kW-mo/yr
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,026 | $1,800 |
$1,511
29,061
kWh
|
$515
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $106,292 | $106,971 |
$46,378
891,883
kWh
|
$22,051
-
kW-mo/yr
|
$37,862
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs