ITAC Assessment: UC2313
ITAC logo
ITAC Assessment: UC2313
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Custom plastic injection molding
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 100,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $262,183 2,077,208
kWh
Electricity Demand $122,253 8,382
kW-mo/yr
Electricity Fees $17,951 -
Natural Gas $20,784 1,669
MMBtu
Waste Disposal Costs
Water Usage $6,168 1,882
Tgal
TOTAL YEARLY COSTS $429,338
RECOMMENDED SAVINGS* $17,701 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.8123: Pay utility bills on time $275 - - - $275 -
02 2.6218: Turn off equipment when not in use $4,527 $1,500 $4,527
35,873
kWh
- - -
03 2.2511: Insulate bare equipment $1,066 $3,500 $1,066
8,447
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $732 $428 $632
5,005
kWh
$100
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $873 $1,300 $754
5,973
kWh
$119
-
kW-mo/yr
- -
06 2.6231: Utilize controls to operate equipment only when needed $251 $50 $251
1,989
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,805 $75 $1,559
12,351
kWh
$247
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,884 $16,157 $2,490
19,730
kWh
$394
-
kW-mo/yr
- -
09 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $4,673 $19,488 $2,852
22,600
kWh
$451
-
kW-mo/yr
- $1,370
-
MMBtu
10 2.7261: Install timers and/or thermostats $615 $1,053 $92
728
kWh
- - $523
-
MMBtu
TOTAL RECOMMENDED $17,701 $43,550 $14,222
112,697
kWh
$1,311
-
kW-mo/yr
$275 $1,892
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs