ITAC Assessment: MS0202
ITAC logo
ITAC Assessment: MS0202
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Steel industrial valves
NAICS
n/a
SIC 3493: Steel Springs, Except Wire
Sales Range $10
M
to 50
M
# of Employees 107
Plant Area 93,525
ft2
Annual Production 24,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,004 2,276,084
kWh
Electricity Demand $66,624 7,164
kW-mo/yr
Electricity Fees $3,663 -
Natural Gas $40,523 4,248
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,767 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,716

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $8,051 $5,798 - - - $8,051
-
MMBtu
-
02 2.2437: Recover waste heat from equipment $6,165 $2,954 - - - $6,165
-
MMBtu
-
03 2.7231: Use radiant heater for spot heating $5,910 $800 $2,311
67,409
kWh
$3,512
-
kW-mo/yr
$87 - -
04 2.7261: Install timers and/or thermostats $1,270 $100 $1,251
36,342
kWh
- $19 - -
05 2.6214: Shut off pilots in standby equipment $571 $173 - - - $571
-
MMBtu
-
06 3.5217: Reuse / recycle/ sell paper products $4,800 - - - - - $4,800
-
lb
TOTAL RECOMMENDED $26,767 $9,825 $3,562
103,751
kWh
$3,512
-
kW-mo/yr
$106 $14,787
-
MMBtu
$4,800
-
lb
TOTAL IMPLEMENTED $18,716 $4,027 $3,562
103,751
kWh
$3,512
-
kW-mo/yr
$106 $6,736
-
MMBtu
$4,800
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs