Assessment Year | 2010 |
---|---|
Principal Product | Ice coolers, lanterns, stools |
NAICS | 339999: All Other Miscellaneous Manufacturing |
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 1,000 |
Plant Area |
1,300,000
ft2
|
Annual Production | 1,200,000
pieces
|
Production Hrs. Annual | 7,904
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,782,700 | 48,043,200 |
kWh
|
$0.058 |
Natural Gas | $1,180,215 | 158,086 |
MMBtu
|
$7.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $764,581 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $137,711 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $88,705 | $104,400 | - |
$88,705
-
MMBtu
|
|
02 | 2.7492: Use proper thickness of insulation on building envelope | $150,096 | $1,969,500 | - |
$150,096
-
MMBtu
|
|
03 | 2.7495: Install replacement doors | $1,246 | $33,150 | - |
$1,246
-
MMBtu
|
|
04 | 2.6231: Utilize controls to operate equipment only when needed | $217,752 | $100,000 |
$217,752
3,773,874
kWh
|
- | |
05 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $104,850 | $134,480 |
$104,850
1,817,165
kWh
|
- | |
06 | 2.7135: Install occupancy sensors | $8,717 | $17,813 |
$8,717
151,083
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $33,411 | $69,755 |
$33,411
579,051
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,971 | $111,113 |
$26,971
467,434
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,136 | $21,130 |
$3,136
54,354
kWh
|
- | |
10 | 2.2511: Insulate bare equipment | $67,527 | $42,259 |
$67,527
1,170,304
kWh
|
- | |
11 | 2.2511: Insulate bare equipment | $21,881 | $4,522 |
$21,881
379,219
kWh
|
- | |
12 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,071 | $995 |
$13,071
244,740
kWh
|
- | |
13 | 2.4224: Upgrade controls on compressors | $27,218 | $30,300 |
$27,218
471,710
kWh
|
- | |
TOTAL RECOMMENDED | $764,581 | $2,639,417 |
$524,534
9,108,934
kWh
|
$240,047
-
MMBtu
|
||
TOTAL IMPLEMENTED | $137,711 | $153,508 |
$49,006
867,533
kWh
|
$88,705
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs