Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,698

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1007 #02 Y:2019 Utilize energy-efficient belts and other improved mechanisms $924 -
UD1007 #01 Y:2019 Develop a repair/replace policy $21,932 -
IP0129 #04 Y:2019 Install occupancy sensors $633 $1,137
IP0129 #03 Y:2019 Reduce the pressure of compressed air to the minimum required $148 $125
IP0129 #02 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $1,369 $210
IP0129 #01 Y:2019 Turn off equipment during breaks, reduce operating time $213 $5
IC0229 #06 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $25,286 $15,316
IC0229 #05 Y:2019 Operate distillation columns efficiently $20,792 $12,047
IC0229 #04 Y:2019 Eliminate cooling of process streams which subsequently must be heated and vice versa $2,133 $2,010
IC0229 #03 Y:2019 Utilize higher efficiency lamps and/or ballasts $10,701 $2,326
IC0229 #02 Y:2019 Insulate bare equipment $1,024 $1,131
IC0229 #01 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $1,396 $4,200
IC0228 #05 Y:2019 Reduce the pressure of compressed air to the minimum required $759 $167
IC0228 #04 Y:2019 Use waste heat from hot flue gases to preheat $25,006 $4,868
IC0228 #03 Y:2019 Repair or replace steam traps $9,605 $2,359
IC0228 #02 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $51,760 $4,700
IC0228 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $15,679 $14,948
WM0151 #07 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $1,432 $3,450
WM0151 #06 Y:2019 Lower temperature during the winter season and vice-versa $1,501 $500
WM0151 #05 Y:2019 Reduce the pressure of compressed air to the minimum required $2,678 $2,900