ITAC Assessment: UD1007
ITAC logo
ITAC Assessment: UD1007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Bacon
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $100
M
to 500
M
# of Employees 515
Plant Area 65,000
ft2
Annual Production 1,200,000,000
pieces
Production Hrs. Annual 5,616
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,031,980 34,943,773
kWh
Electricity Demand $205,368 56,111
kW-mo/yr
Natural Gas $262,217 38,283
MMBtu
TOTAL YEARLY COSTS $2,499,565
RECOMMENDED SAVINGS* $242,356 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,419

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4151: Develop a repair/replace policy $21,932 - $19,332
332,444
kWh
$2,600
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $924 - $769
13,223
kWh
$155
-
kW-mo/yr
-
03 2.2612: Use cooling tower water instead of refrigeration $87,749 $5,000 $78,701
1,353,420
kWh
$9,048
-
kW-mo/yr
-
04 2.2696: Use excess cold process fluid for industrial cooling needs $80,784 $10,000 $74,372
1,278,960
kWh
$6,412
-
kW-mo/yr
-
05 2.2696: Use excess cold process fluid for industrial cooling needs $4,980 - $4,585
78,840
kWh
$395
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,566 $4,400 $3,566
61,320
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,535 $500 $3,535
60,788
kWh
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $2,204 - $2,204
37,907
kWh
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,737 $1,000 $1,848
31,784
kWh
$249
-
kW-mo/yr
$(-360.0)
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,710 $34,800 $18,898
324,991
kWh
$3,812
-
kW-mo/yr
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $12,235 $23,550 $10,850
186,588
kWh
$935
-
kW-mo/yr
$450
TOTAL RECOMMENDED $242,356 $79,250 $218,660
3,760,265
kWh
$23,606
-
kW-mo/yr
$90
TOTAL IMPLEMENTED $19,419 $23,550 $17,639
303,335
kWh
$1,330
-
kW-mo/yr
$450
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs