Assessment Year | 2006 |
---|---|
Principal Product | Heat Transfer Equipment |
NAICS | 332410: Power Boiler and Heat Exchanger Manufacturing |
SIC | 3440: |
Sales Range | $50 M to 100M |
# of Employees | 303 |
Plant Area |
250,000
ft2
|
Annual Production | 4,800
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $424,057 | 4,880,160 |
kWh
|
$0.087 |
Electricity Demand | $168,877 | 12,870 |
kW-mo/yr
|
$13.12 |
Electricity Fees | $29,670 | - |
|
- |
Natural Gas | $301,650 | 36,166 |
MMBtu
|
$8.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $128,776 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $120,868 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $19,527 | - | - | - | - | $19,527 | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,958 | - |
$5,749
66,082
kWh
|
$2,209
-
kW-mo/yr
|
- | - | |
03 | 2.4314: Use synthetic lubricant | $6,237 | - |
$4,499
51,714
kWh
|
$1,738
-
kW-mo/yr
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,565 | - |
$4,023
46,239
kWh
|
$1,542
-
kW-mo/yr
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $5,565 | $1,608 |
$4,023
46,239
kWh
|
$1,542
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $72,359 | $27,000 |
$56,139
645,278
kWh
|
$16,220
-
kW-mo/yr
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,657 | $1,484 |
$2,834
32,573
kWh
|
$823
-
kW-mo/yr
|
- | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,115 | $5,820 |
$3,246
37,315
kWh
|
$1,869
-
kW-mo/yr
|
- | - | |
09 | 2.6211: Conserve energy by efficient use of vending machines | $444 | $746 |
$366
4,205
kWh
|
- | $78 | - | |
10 | 2.3212: Optimize plant power factor | $2,349 | $9,623 | - | - | $2,349 | - | |
TOTAL RECOMMENDED | $128,776 | $46,281 |
$80,879
929,645
kWh
|
$25,943
-
kW-mo/yr
|
$2,427 | $19,527 | ||
TOTAL IMPLEMENTED | $120,868 | $30,092 |
$77,267
888,125
kWh
|
$24,074
-
kW-mo/yr
|
- | $19,527 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs