ITAC Assessment: DL0002
ITAC logo
ITAC Assessment: DL0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Calendered PVC Films and Laminates
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2754: Commercial Printing, Gravure
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 100,000
ft2
Annual Production 14,000,000
lb
Production Hrs. Annual 4,800
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,425,532 14,085,691
kWh
Natural Gas $518,500 28,806
MMBtu
Fuel Oil #6 $537,191 66,936
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $111,195 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $21,414 $10,000 - - $21,414
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $49,771 $62,783 $49,771
469,971
kWh
- -
03 2.2622: Replace existing chiller with high efficiency model $19,418 $73,950 $19,418
183,362
kWh
- -
04 2.9111: Use solar heat to heat make-up air $20,592 $100,100 - $20,592
-
MMBtu
-
TOTAL RECOMMENDED $111,195 $246,833 $69,189