Assessment Year | 2025 |
---|---|
Principal Product | Printed Labels |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 349 |
Plant Area |
177,500
ft2
|
Annual Production | 1,400,000,000
units
|
Production Hrs. Annual | 8,008
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $378,577 | 6,872,296 |
kWh
|
$0.055 |
Electricity Demand | $211,772 | 14,178 |
kW-mo/yr
|
$14.94 |
Electricity Fees | $99,380 | - |
|
- |
TOTAL YEARLY COSTS | $689,729 | |||
RECOMMENDED SAVINGS* | $271,022 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $49,710 | $322,608 |
$35,370
643,092
kWh
|
$14,340
-
kW-mo/yr
|
- | |
02 | 2.3191: Use demand controller or load shedder | $41,281 | $36,971 |
$26,458
481,061
kWh
|
$14,823
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $5,328 | $1,140 |
$5,328
96,871
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,036 | $15,920 |
$7,036
127,923
kWh
|
- | - | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $3,655 | $12,290 |
$4,284
77,889
kWh
|
$(-629.0)
-
kW-mo/yr
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $2,871 | - |
$2,871
52,200
kWh
|
- | - | |
07 | 2.5194: Redesign process | $1,168 | $4,600 |
$1,168
21,236
kWh
|
- | - | |
08 | 2.4224: Upgrade controls on compressors | $1,107 | $280 |
$1,107
20,123
kWh
|
- | - | |
09 | 4.652: Replace existing equipment with more suitable substitutes | $75,600 | $740 | - | - | $75,600 | |
10 | 4.424: Improve space comfort conditioning | $57,669 | $2,320 |
$(-502.0)
(-9,126)
kWh
|
$(-629.0)
-
kW-mo/yr
|
$58,800 | |
11 | 4.652: Replace existing equipment with more suitable substitutes | $25,597 | $60,000 |
$10,985
199,724
kWh
|
$14,612
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $271,022 | $456,869 |
$94,105
1,710,993
kWh
|
$42,517
-
kW-mo/yr
|
$134,400 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs