Assessment Year | 2019 |
---|---|
Principal Product | Rolled Coils |
NAICS | 331110: Iron and Steel Mills and Ferroalloy Manufacturing |
SIC | 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills |
Sales Range | $100 M to 500M |
# of Employees | 125 |
Plant Area |
51,500
ft2
|
Annual Production | 635,000
ton
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $3,657,648 | 63,993,180 |
kWh
|
$0.057 | |
Natural Gas | $2,879,667 | 726,286 |
MMBtu
|
$3.96 | |
Waste Disposal Costs | |||||
Water Usage | $159,528 | 54,627 |
Tgal
|
$2.92 | |
TOTAL YEARLY COSTS | $6,696,843 | ||||
RECOMMENDED SAVINGS* | $50,954 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $2,933 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $15,820 | $47,000 |
$15,820
276,605
kWh
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $12,520 | $29,000 | - |
$12,520
-
MMBtu
|
|
03 | 2.4314: Use synthetic lubricant | $12,145 | $29,080 |
$12,145
212,320
kWh
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,858 | $5,600 |
$4,858
84,928
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,678 | $2,900 |
$2,678
46,816
kWh
|
- | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $1,501 | $500 |
$1,501
26,241
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,432 | $3,450 |
$1,432
25,030
kWh
|
- | |
TOTAL RECOMMENDED | $50,954 | $117,530 |
$38,434
671,940
kWh
|
$12,520
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,933 | $3,950 |
$2,933
51,271
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs