Assessment Year | 1991 |
---|---|
Principal Product | LABELS |
NAICS |
n/a
|
SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 325 |
Plant Area |
n/a
|
Annual Production | 1,283,694
thousand feet
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $527,522 | 11,234,174 |
kWh
|
$0.047 |
Natural Gas | $398,785 | 149,739 |
MMBtu
|
$2.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $354,285 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $273,825 | - |
$402,384
8,570,633
kWh
|
$(-128,559.0)
-
MMBtu
|
- | |
02 | 2.7226: Use computer programs to optimize hvac performance | $42,794 | $88,000 |
$42,794
911,489
kWh
|
- | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $14,004 | - |
$33,340
710,141
kWh
|
$(-19,336.0)
-
MMBtu
|
- | |
04 | 2.4323: Use optimum size and capacity equipment | $12,446 | $45,900 | - |
$12,446
-
MMBtu
|
- | |
05 | 3.4115: Recover and reuse cooling water | $7,804 | $9,000 |
$1,000
21,395
kWh
|
- | $6,804 | |
06 | 2.2621: Modify refrigeration system to operate at a lower pressure | $2,697 | $3,200 |
$2,697
57,444
kWh
|
- | - | |
07 | 2.6232: Install set-back timers | $522 | $200 |
$522
11,137
kWh
|
- | - | |
08 | 2.6232: Install set-back timers | $193 | $282 |
$193
4,103
kWh
|
- | - | |
TOTAL RECOMMENDED | $354,285 | $146,582 |
$482,930
10,286,342
kWh
|
$(-135,449.0)
-
MMBtu
|
$6,804 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs