ITAC Assessment: IC0228
ITAC logo
ITAC Assessment: IC0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Drawn/Heat Treated Wire
NAICS 331222: Steel Wire Drawing
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $100
M
to 500
M
# of Employees 114
Plant Area 204,500
ft2
Annual Production 180,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,636,492 26,721,560
kWh
Electricity Demand $637,449 53,222
kW-mo/yr
Electricity Fees $245,238 -
Natural Gas $284,926 79,500
MMBtu
Waste Disposal Costs
Water Usage $80,246 23,719,500
Tgal
Water Disposal $203,010 23,720
Tgal
TOTAL YEARLY COSTS $3,087,362
RECOMMENDED SAVINGS* $102,809 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,284

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,679 $14,948 $11,623
193,712
kWh
$4,056
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $51,760 $4,700 $50,603
843,384
kWh
$1,157
-
kW-mo/yr
-
03 2.2113: Repair or replace steam traps $9,605 $2,359 - - $9,605
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $25,006 $4,868 - - $25,006
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $759 $167 $759
12,648
kWh
- -
TOTAL RECOMMENDED $102,809 $27,042 $62,985
1,049,744
kWh
$5,213
-
kW-mo/yr
$34,611
-
MMBtu
TOTAL IMPLEMENTED $25,284 $17,307 $11,623
193,712
kWh
$4,056
-
kW-mo/yr
$9,605
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs