Assessment Year | 2019 |
---|---|
Principal Product | Drawn/Heat Treated Wire |
NAICS | 331222: Steel Wire Drawing |
SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
Sales Range | $100 M to 500M |
# of Employees | 114 |
Plant Area |
204,500
ft2
|
Annual Production | 180,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,636,492 | 26,721,560 |
kWh
|
$0.061 | |
Electricity Demand | $637,449 | 53,222 |
kW-mo/yr
|
$11.98 | |
Electricity Fees | $245,238 | - |
|
- | |
Natural Gas | $284,926 | 79,500 |
MMBtu
|
$3.58 | |
Waste Disposal Costs | |||||
Water Usage | $80,246 | 23,719,500 |
Tgal
|
$0.003 | |
Water Disposal | $203,010 | 23,720 |
Tgal
|
$8.56 | |
TOTAL YEARLY COSTS | $3,087,362 | ||||
RECOMMENDED SAVINGS* | $102,809 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $25,284 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,679 | $14,948 |
$11,623
193,712
kWh
|
$4,056
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $51,760 | $4,700 |
$50,603
843,384
kWh
|
$1,157
-
kW-mo/yr
|
- | |
03 | 2.2113: Repair or replace steam traps | $9,605 | $2,359 | - | - |
$9,605
-
MMBtu
|
|
04 | 2.2414: Use waste heat from hot flue gases to preheat | $25,006 | $4,868 | - | - |
$25,006
-
MMBtu
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $759 | $167 |
$759
12,648
kWh
|
- | - | |
TOTAL RECOMMENDED | $102,809 | $27,042 |
$62,985
1,049,744
kWh
|
$5,213
-
kW-mo/yr
|
$34,611
-
MMBtu
|
||
TOTAL IMPLEMENTED | $25,284 | $17,307 |
$11,623
193,712
kWh
|
$4,056
-
kW-mo/yr
|
$9,605
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs