Assessment Year | 2001 |
---|---|
Principal Product | Plastic Mouldings |
NAICS |
n/a
|
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
105,000
ft2
|
Annual Production | 20,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $198,256 | 6,271,764 |
kWh
|
$0.032 |
Electricity Demand | $118,936 | 13,308 |
kW-mo/yr
|
$8.94 |
Electricity Fees | $23,977 | - |
|
- |
Natural Gas | $54,977 | 9,244 |
MMBtu
|
$5.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $105,113 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,086 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.652: Replace existing equipment with more suitable substitutes | $44,317 | $130,000 | - |
$9,277
-
kW-mo/yr
|
- | - | - | $35,040 | - | |
02 | 2.2621: Modify refrigeration system to operate at a lower pressure | $18,517 | $55,500 |
$14,140
423,360
kWh
|
$4,377
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $17,905 | $8,955 |
$13,369
400,266
kWh
|
$4,536
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $4,782 | $19,554 | n/a |
$3,460
103,596
kWh
|
$1,322
-
kW-mo/yr
|
- | - | - | - | - |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,007 | $15,230 |
$2,965
88,777
kWh
|
$1,042
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.3212: Optimize plant power factor | $3,649 | $12,800 | - | - | $3,649 | - | - | - | - | |
07 | 2.2511: Insulate bare equipment | $3,311 | $618 |
$2,528
75,692
kWh
|
$783
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $2,578 | $640 |
$1,993
59,680
kWh
|
$585
-
kW-mo/yr
|
- | - | - | - | - | |
09 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $2,238 | $8,550 | - | - | - | - |
$2,638
-
lb
|
$(-400.0) | - | |
10 | 3.6192: Use a less expensive method of waste removal | $2,181 | - | - | - | - | - | - | - | $2,181 | |
11 | 3.8142: Distill contaminated solvents for reuse | $1,628 | $5,000 | - | - | - |
$3,085
-
gal
|
$(-683.0)
-
lb
|
$(-774.0) | - | |
TOTAL RECOMMENDED | $105,113 | $256,847 |
$38,455
1,151,371
kWh
|
$21,922
-
kW-mo/yr
|
$3,649 |
$3,085
-
gal
|
$1,955
-
lb
|
$33,866 | $2,181 | ||
TOTAL IMPLEMENTED | $20,086 | $8,955 |
$13,369
400,266
kWh
|
$4,536
-
kW-mo/yr
|
- | - | - | - | $2,181 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs