Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,596

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UW2604 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $20,196 $17,161
UW2604 #02 Y:2026 Use most efficient type of electric motors $1,937 $13,038
UW2604 #01 Y:2026 Burn wood by-products for heat $2,032,454 $2,773,200
CI0081 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $555 $396
CI0081 #03 Y:2026 Use photocell controls $1,270 $450
CI0081 #02 Y:2026 Adjust / maintain fork lift trucks for most efficient operation $2,178 $32,000
CI0081 #01 Y:2026 Use optimum thickness insulation $12,948 $176,000
CI0080 #08 Y:2026 Replace fossil fuel equipment with electrical equipment $2,020 $7,000
CI0080 #07 Y:2026 Optimize plant power factor $2,237 $6,500
CI0080 #06 Y:2026 Convert to high volume low pressure (hvlp) paint guns $3,360 $7,500
CI0080 #05 Y:2026 Install or upgrade insulation on hvac distribution systems $5,763 $30,000
CI0080 #04 Y:2026 Reduce the pressure of compressed air to the minimum required $12,133 $7,225
CI0080 #03 Y:2026 Adjust / maintain fork lift trucks for most efficient operation $39,972 $78,000
CI0080 #02 Y:2026 Size air handling grills/ duct/s coils to minimize air resistance $50,000 $365,000
CI0080 #01 Y:2026 Replace existing equipment with more suitable substitutes $230,000 $1,000,000
SJ0047 #04 Y:2026 Use optimum temperature $2,016 -
SJ0047 #03 Y:2026 Preheat boiler makeup water with waste process heat $2,804 $626
SJ0047 #02 Y:2026 Reschedule and rearrange multiple-source heating systems $12,716 -
SJ0047 #01 Y:2026 Use battery storage for demand control $32,563 $178,188
NT0059 #08 Y:2026 Lower temperature during the winter season and vice-versa $4,998 -