170,596
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UW2604 #03 Y:2026 | 03 | 2026 | Utilize higher efficiency lamps and/or ballasts | $20,196 | $17,161 |
n/a
|
| UW2604 #02 Y:2026 | 02 | 2026 | Use most efficient type of electric motors | $1,937 | $13,038 |
n/a
|
| UW2604 #01 Y:2026 | 01 | 2026 | Burn wood by-products for heat | $2,032,454 | $2,773,200 |
n/a
|
| CI0081 #04 Y:2026 | 04 | 2026 | Utilize higher efficiency lamps and/or ballasts | $555 | $396 |
n/a
|
| CI0081 #03 Y:2026 | 03 | 2026 | Use photocell controls | $1,270 | $450 |
n/a
|
| CI0081 #02 Y:2026 | 02 | 2026 | Adjust / maintain fork lift trucks for most efficient operation | $2,178 | $32,000 |
n/a
|
| CI0081 #01 Y:2026 | 01 | 2026 | Use optimum thickness insulation | $12,948 | $176,000 |
n/a
|
| CI0080 #08 Y:2026 | 08 | 2026 | Replace fossil fuel equipment with electrical equipment | $2,020 | $7,000 |
n/a
|
| CI0080 #07 Y:2026 | 07 | 2026 | Optimize plant power factor | $2,237 | $6,500 |
n/a
|
| CI0080 #06 Y:2026 | 06 | 2026 | Convert to high volume low pressure (hvlp) paint guns | $3,360 | $7,500 |
n/a
|
| CI0080 #05 Y:2026 | 05 | 2026 | Install or upgrade insulation on hvac distribution systems | $5,763 | $30,000 |
n/a
|
| CI0080 #04 Y:2026 | 04 | 2026 | Reduce the pressure of compressed air to the minimum required | $12,133 | $7,225 |
n/a
|
| CI0080 #03 Y:2026 | 03 | 2026 | Adjust / maintain fork lift trucks for most efficient operation | $39,972 | $78,000 |
n/a
|
| CI0080 #02 Y:2026 | 02 | 2026 | Size air handling grills/ duct/s coils to minimize air resistance | $50,000 | $365,000 |
n/a
|
| CI0080 #01 Y:2026 | 01 | 2026 | Replace existing equipment with more suitable substitutes | $230,000 | $1,000,000 |
n/a
|
| SJ0047 #04 Y:2026 | 04 | 2026 | Use optimum temperature | $2,016 | - |
n/a
|
| SJ0047 #03 Y:2026 | 03 | 2026 | Preheat boiler makeup water with waste process heat | $2,804 | $626 |
n/a
|
| SJ0047 #02 Y:2026 | 02 | 2026 | Reschedule and rearrange multiple-source heating systems | $12,716 | - |
n/a
|
| SJ0047 #01 Y:2026 | 01 | 2026 | Use battery storage for demand control | $32,563 | $178,188 |
n/a
|
| NT0059 #08 Y:2026 | 08 | 2026 | Lower temperature during the winter season and vice-versa | $4,998 | - |
n/a
|