ITAC Assessment: CI0081
ITAC logo
ITAC Assessment: CI0081
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Warehouse
NAICS 423840: Industrial Supplies Merchant Wholesalers
SIC 5085: Industrial Supplies
Sales Range $100
M
to 500
M
# of Employees 99
Plant Area 65,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,558 101,176
kWh
Electricity Demand $35,539 1,048
kW-mo/yr
Electricity Fees $9,317 -
Natural Gas $2,089 118
MMBtu
LPG $5,333 138
MMBtu
Other Gas $435 1
MMBtu
Waste Disposal Costs
Water Usage $3,183 456
Tgal
Other Liquid (non-haz) $8,120 1
gal
TOTAL YEARLY COSTS $76,574
RECOMMENDED SAVINGS* $16,951 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.2515: Use optimum thickness insulation $12,948 $176,000 $12,948
104,334
kWh
- - - -
02 2.8227: Adjust / maintain fork lift trucks for most efficient operation $2,178 $32,000 $(-2,452.0)
(-19,762)
kWh
$(-703.0)
-
kW-mo/yr
$5,333
-
MMBtu
- -
03 2.7134: Use photocell controls $1,270 $450 $630
5,076
kWh
$515
-
kW-mo/yr
- $36 $89
04 2.7142: Utilize higher efficiency lamps and/or ballasts $555 $396 $350
2,818
kWh
$205
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $16,951 $208,846 $11,476
92,466
kWh
$17
-
kW-mo/yr
$5,333
-
MMBtu
$36 $89
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs