| Assessment Year | 2026 |
|---|---|
| Principal Product | Sludge Biosolids |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $50 M to 100M |
| # of Employees | 21 |
| Plant Area |
507,000
ft2
|
| Annual Production | 26,280
ton
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Alaska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $487,074 | 5,479,018 |
kWh
|
$0.089 | |
| Electricity Demand | $356,952 | 9,620 |
kW-mo/yr
|
$37.11 | |
| Electricity Fees | $133,996 | - |
|
- | |
| Natural Gas | $538,033 | 54,290 |
MMBtu
|
$9.91 | |
| Fuel Oil #2 | $12,893 | 299 |
MMBtu
|
$43.12 | |
| Other Gas | $50,986 | 1 |
MMBtu
|
$50,986.00 | |
| Waste Disposal Costs | |||||
| Water Usage | $2,744,620 | 190,997 |
Tgal
|
$14.37 | |
| Solid Waste (non-haz) | $225,527 | 5,213,933 |
lb
|
$0.043 | |
| TOTAL YEARLY COSTS | $4,550,081 | ||||
| RECOMMENDED SAVINGS* | $2,322,304 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Water Usage Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.6123: Burn wood by-products for heat | $2,032,454 | $1,536,600 | - | - |
$125,007
-
MMBtu
|
- | - |
$225,527
-
lb
|
$1,681,920 | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $1,937 | $19,404 |
$1,137
12,790
kWh
|
$650
-
kW-mo/yr
|
- | - | - | - | - | $150 | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,196 | $20,581 |
$12,850
144,540
kWh
|
$7,346
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 04 | 2.8226: Increase efficiency of trucks | $13,220 | $159,000 |
$(-1,495.0)
(-16,819)
kWh
|
- | - |
$12,893
-
MMBtu
|
- | - | - | $1,822 | |
| 05 | 2.2441: Preheat boiler makeup water with waste process heat | $142,638 | $20,879 | - | - |
$142,638
-
MMBtu
|
- | - | - | - | - | |
| 06 | 4.652: Replace existing equipment with more suitable substitutes | $111,859 | $272,750 | - | - |
$4,256
-
MMBtu
|
- |
$107,603
-
Tgal
|
- | - | - | |
| TOTAL RECOMMENDED | $2,322,304 | $2,029,214 |
$12,492
140,511
kWh
|
$7,996
-
kW-mo/yr
|
$271,901
-
MMBtu
|
$12,893
-
MMBtu
|
$107,603
-
Tgal
|
$225,527
-
lb
|
$1,681,920 | $1,972 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Water Usage Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs