ITAC Assessment: UW2604
ITAC logo
ITAC Assessment: UW2604
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Sludge Biosolids
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $50
M
to 100
M
# of Employees 21
Plant Area 507,000
ft2
Annual Production 26,280
ton
Production Hrs. Annual 8,760
hrs
Location (State) Alaska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $487,074 5,479,018
kWh
Electricity Demand $356,952 9,620
kW-mo/yr
Electricity Fees $133,996 -
Natural Gas $538,033 54,290
MMBtu
Fuel Oil #2 $12,893 299
MMBtu
Other Gas $50,986 1
MMBtu
Waste Disposal Costs
Water Usage $2,744,620 190,997
Tgal
Solid Waste (non-haz) $225,527 5,213,933
lb
TOTAL YEARLY COSTS $4,550,081
RECOMMENDED SAVINGS* $2,322,304 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Water Usage Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 3.6123: Burn wood by-products for heat $2,032,454 $1,536,600 - - $125,007
-
MMBtu
- - $225,527
-
lb
$1,681,920 -
02 2.4133: Use most efficient type of electric motors $1,937 $19,404 $1,137
12,790
kWh
$650
-
kW-mo/yr
- - - - - $150
03 2.7142: Utilize higher efficiency lamps and/or ballasts $20,196 $20,581 $12,850
144,540
kWh
$7,346
-
kW-mo/yr
- - - - - -
04 2.8226: Increase efficiency of trucks $13,220 $159,000 $(-1,495.0)
(-16,819)
kWh
- - $12,893
-
MMBtu
- - - $1,822
05 2.2441: Preheat boiler makeup water with waste process heat $142,638 $20,879 - - $142,638
-
MMBtu
- - - - -
06 4.652: Replace existing equipment with more suitable substitutes $111,859 $272,750 - - $4,256
-
MMBtu
- $107,603
-
Tgal
- - -
TOTAL RECOMMENDED $2,322,304 $2,029,214 $12,492
140,511
kWh
$7,996
-
kW-mo/yr
$271,901
-
MMBtu
$12,893
-
MMBtu
$107,603
-
Tgal
$225,527
-
lb
$1,681,920 $1,972
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Water Usage Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs