Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Cancer genomic testing services
NAICS 325414: Biological Product (except Diagnostic) Manufacturing
SIC 2836: Biological Products, Except Diagnostic Substances
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 100,000
ft2
Annual Production 73,000
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $589,604 3,469,322
kWh
Electricity Demand $256,078 7,262
kW-mo/yr
Natural Gas $143,924 8,453
MMBtu
TOTAL YEARLY COSTS $989,606
RECOMMENDED SAVINGS* $50,099 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3141: Use battery storage for demand control $32,563 $178,188 $(-2,119.0)
(-12,465)
kWh
$34,682
-
kW-mo/yr
-
02 2.7291: Reschedule and rearrange multiple-source heating systems $12,716 - - - $12,716
-
MMBtu
03 2.2441: Preheat boiler makeup water with waste process heat $2,804 $626 - - $2,804
-
MMBtu
04 2.2211: Use optimum temperature $2,016 - $1,497
8,806
kWh
- $519
-
MMBtu
TOTAL RECOMMENDED $50,099 $178,814 $(-622.0)
(-3,659)
kWh
$34,682
-
kW-mo/yr
$16,039
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs