Assessment Year | 2017 |
---|---|
Principal Product | Catalyst |
NAICS | 325180: Other Basic Inorganic Chemical Manufacturing |
SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 51 |
Plant Area |
128,476
ft2
|
Annual Production | 700,000,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $288,685 | 4,189,278 |
kWh
|
$0.069 |
Natural Gas | $162,452 | 37,026 |
MMBtu
|
$4.39 |
TOTAL YEARLY COSTS | $451,137 | |||
RECOMMENDED SAVINGS* | $94,207 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $33,330 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $23,730 | $42,000 | - | - |
$23,730
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29,000 | $48,139 |
$29,000
420,287
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $532 | $4,727 |
$532
7,714
kWh
|
- | - | |
04 | 2.2135: Repair and eliminate steam leaks | $12,697 | $2,712 |
$12,697
184,203
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,138 | $23,262 |
$21,138
306,355
kWh
|
- | - | |
06 | 2.3212: Optimize plant power factor | $2,384 | $16,995 | - | $2,384 | - | |
07 | 2.8123: Pay utility bills on time | $4,330 | - | - | $4,330 | - | |
08 | 2.6232: Install set-back timers | $396 | $148 |
$396
5,735
kWh
|
- | - | |
TOTAL RECOMMENDED | $94,207 | $137,983 |
$63,763
924,294
kWh
|
$6,714 |
$23,730
-
MMBtu
|
||
TOTAL IMPLEMENTED | $33,330 | $48,139 |
$29,000
420,287
kWh
|
$4,330 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs