ITAC Assessment: OK0969
ITAC logo
ITAC Assessment: OK0969
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Catalyst
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 51
Plant Area 128,476
ft2
Annual Production 700,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,685 4,189,278
kWh
Natural Gas $162,452 37,026
MMBtu
TOTAL YEARLY COSTS $451,137
RECOMMENDED SAVINGS* $94,207 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,330

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $23,730 $42,000 - - $23,730
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $29,000 $48,139 $29,000
420,287
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $532 $4,727 $532
7,714
kWh
- -
04 2.2135: Repair and eliminate steam leaks $12,697 $2,712 $12,697
184,203
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,138 $23,262 $21,138
306,355
kWh
- -
06 2.3212: Optimize plant power factor $2,384 $16,995 - $2,384 -
07 2.8123: Pay utility bills on time $4,330 - - $4,330 -
08 2.6232: Install set-back timers $396 $148 $396
5,735
kWh
- -
TOTAL RECOMMENDED $94,207 $137,983 $63,763
924,294
kWh
$6,714 $23,730
-
MMBtu
TOTAL IMPLEMENTED $33,330 $48,139 $29,000
420,287
kWh
$4,330 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs