Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Gears and Power Transmission
NAICS 333612: Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $100
M
to 500
M
# of Employees 99
Plant Area 180,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 5,590
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $256,122 2,491,594
kWh
Electricity Demand $258,743 6,600
kW-mo/yr
Electricity Fees $66,675 -
Natural Gas $4,971 304
MMBtu
LPG $45,540 1,180
MMBtu
Other Gas $921 1
MMBtu
TOTAL YEARLY COSTS $632,972
RECOMMENDED SAVINGS* $345,485 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Other Liquid (non-haz) Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
01 4.652: Replace existing equipment with more suitable substitutes $230,000 $1,000,000 - - - - - - - $230,000
02 2.5125: Size air handling grills/ duct/s coils to minimize air resistance $50,000 $365,000 $24,000
233,463
kWh
- - - - - $26,000 -
03 2.8227: Adjust / maintain fork lift trucks for most efficient operation $39,972 $78,000 $(-3,592.0)
(-34,944)
kWh
$(-1,976.0)
-
kW-mo/yr
- - $45,540
-
MMBtu
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $12,133 $7,225 $3,552
34,549
kWh
$6,582
-
kW-mo/yr
- - - - $1,999 -
05 2.7212: Install or upgrade insulation on hvac distribution systems $5,763 $30,000 $5,763
56,061
kWh
- - - - - - -
06 3.2123: Convert to high volume low pressure (hvlp) paint guns $3,360 $7,500 - - - - - $3,360
-
gal
- -
07 2.3212: Optimize plant power factor $2,237 $6,500 - - $2,237 - - - - -
08 2.1321: Replace fossil fuel equipment with electrical equipment $2,020 $7,000 $(-1,962.0)
(-18,993)
kWh
- - $3,982
-
MMBtu
- - - -
TOTAL RECOMMENDED $345,485 $1,501,225 $27,761
270,136
kWh
$4,606
-
kW-mo/yr
$2,237 $3,982
-
MMBtu
$45,540
-
MMBtu
$3,360
-
gal
$27,999 $230,000
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Other Liquid (non-haz) Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs