Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,595

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0606 #04 Y:2026 Install / repair insulation on steam lines $4,761 $3,286
SU0606 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,244 $805
SU0606 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $23,318 $2,383
SU0606 #01 Y:2026 Reduce space conditioning during non-working hours $8,247 $252
OR0830 #03 Y:2026 Use solar heat to make electricty $70,737 $992,750
OR0830 #02 Y:2026 Utilize controls to operate equipment only when needed $41,804 $330,355
OR0830 #01 Y:2026 Install timers on light switches in little used areas $8,099 $3,940
MU0095 #08 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,302 $1,530
MU0095 #07 Y:2026 Install occupancy sensors $322 $1,128
MU0095 #06 Y:2026 Use photocell controls $88 $124
MU0095 #05 Y:2026 Reduce illumination to minimum necessary levels $258 -
MU0095 #04 Y:2026 Turn off equipment when not in use $32 -
MU0095 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $12,746 -
MU0095 #02 Y:2026 Use solar heat to make electricty $66,138 $1,100,000
MU0095 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $64,082 $76,821
LS2608 #04 Y:2026 Eliminate old stock and modify inventory control $13,000 $25,000
LS2608 #03 Y:2026 Install or upgrade insulation on hvac distribution systems $1,928 $2,100
LS2608 #02 Y:2026 Install sub-metering equipment $2,908 $2,250
LS2608 #01 Y:2026 Clean and maintain refrigerant condensers and towers $3,838 $2,300
DL0274 #12 Y:2026 Replace boiler $1,260 $7,000