ITAC Assessment: OR0830
ITAC logo
ITAC Assessment: OR0830
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product CMP Slurries
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 175,000
ft2
Annual Production 13,227,735
lb
Production Hrs. Annual 6,168
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $274,900 3,745,233
kWh
Electricity Demand $156,898 8,054
kW-mo/yr
Electricity Fees $21,414 -
Natural Gas $35,521 2,802
MMBtu
TOTAL YEARLY COSTS $488,733
RECOMMENDED SAVINGS* $120,640 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7132: Install timers on light switches in little used areas $8,099 $3,940 $8,099
110,344
kWh
-
02 2.6231: Utilize controls to operate equipment only when needed $41,804 $330,355 $41,804
569,531
kWh
-
03 2.9114: Use solar heat to make electricty $70,737 $992,750 $41,804
569,537
kWh
$28,933
-
kW-mo/yr
TOTAL RECOMMENDED $120,640 $1,327,045 $91,707
1,249,412
kWh
$28,933
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs