ITAC Assessment: MU0095
ITAC logo
ITAC Assessment: MU0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Glass Auto Parts
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 325,000
ft2
Annual Production 1,600,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,995,951 51,877,000
kWh
Electricity Demand $1,703,170 99,601
kW-mo/yr
Electricity Fees $3,607 -
Natural Gas $27,436 6,086
MMBtu
Other Energy $23,808 1
MMBtu
Waste Disposal Costs
Water Usage $138,021 32,103
Tgal
TOTAL YEARLY COSTS $3,891,993
RECOMMENDED SAVINGS* $146,968 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $64,082 $76,821 $39,644
1,043,264
kWh
$24,438
-
kW-mo/yr
02 2.9114: Use solar heat to make electricty $66,138 $1,100,000 $26,675
701,965
kWh
$39,464
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $12,746 - $7,855
206,717
kWh
$4,891
-
kW-mo/yr
04 2.6218: Turn off equipment when not in use $32 - $20
526
kWh
$12
-
kW-mo/yr
05 2.7111: Reduce illumination to minimum necessary levels $258 - $160
4,205
kWh
$98
-
kW-mo/yr
06 2.7134: Use photocell controls $88 $124 $54
1,433
kWh
$34
-
kW-mo/yr
07 2.7135: Install occupancy sensors $322 $1,128 $119
3,134
kWh
$203
-
kW-mo/yr
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,302 $1,530 $1,837
48,355
kWh
$1,465
-
kW-mo/yr
TOTAL RECOMMENDED $146,968 $1,179,603 $76,364
2,009,598
kWh
$70,604
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs