Assessment Year | 1999 |
---|---|
Principal Product | Pistons |
NAICS |
n/a
|
SIC | 3592: Carburetors, Pistons, Piston Rings, and Valves |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
23,000
ft2
|
Annual Production | 52,000
units
|
Production Hrs. Annual | 4,992
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $80,289 | 1,769,344 |
kWh
|
$0.045 |
Electricity Fees | $1,606 | - |
|
- |
Natural Gas | $699 | 132 |
MMBtu
|
$5.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $41,965 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $11,374 | $1,400 | n/a |
$11,374
287,808
kWh
|
- | - | - |
02 | 2.1331: Burn a less expensive grade of fuel | $(-2,220.0) | $2,395 | n/a |
$(-2,220.0)
(-32,825)
kWh
|
- | - | - |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,695 | $340 | n/a |
$4,695
121,336
kWh
|
- | - | - |
04 | 2.7135: Install occupancy sensors | $568 | $1,098 | n/a |
$568
14,361
kWh
|
- | - | - |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $218 | $224 | n/a |
$93
2,345
kWh
|
- | - | $125 |
06 | 4.445: Install equipment to move product | $24,960 | $31,000 | n/a | - | - | $24,960 | - |
07 | 3.5311: Recover and reuse waste material | $2,370 | $2,000 | n/a | - |
$2,370
-
lb
|
- | - |
TOTAL RECOMMENDED | $41,965 | $38,457 |
$14,510
393,025
kWh
|
$2,370
-
lb
|
$24,960 | $125 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs