ITAC Assessment: OK0581
ITAC logo
ITAC Assessment: OK0581
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Pistons
NAICS
n/a
SIC 3592: Carburetors, Pistons, Piston Rings, and Valves
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 23,000
ft2
Annual Production 52,000
units
Production Hrs. Annual 4,992
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,289 1,769,344
kWh
Electricity Fees $1,606 -
Natural Gas $699 132
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,965 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7241: Install outside air damper / economizer on hvac unit $11,374 $1,400 n/a $11,374
287,808
kWh
- - -
02 2.1331: Burn a less expensive grade of fuel $(-2,220.0) $2,395 n/a $(-2,220.0)
(-32,825)
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,695 $340 n/a $4,695
121,336
kWh
- - -
04 2.7135: Install occupancy sensors $568 $1,098 n/a $568
14,361
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $218 $224 n/a $93
2,345
kWh
- - $125
06 4.445: Install equipment to move product $24,960 $31,000 n/a - - $24,960 -
07 3.5311: Recover and reuse waste material $2,370 $2,000 n/a - $2,370
-
lb
- -
TOTAL RECOMMENDED $41,965 $38,457 $14,510
393,025
kWh
$2,370
-
lb
$24,960 $125
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs