ITAC Assessment: LS2608
ITAC logo
ITAC Assessment: LS2608
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Processed Meat
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 37,135
ft2
Annual Production 1,140,000
units
Production Hrs. Annual 2,210
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,386 668,400
kWh
Electricity Demand $19,005 1,573
kW-mo/yr
Natural Gas $7,026 1,590
MMBtu
Waste Disposal Costs
Water Usage $7,636 285
Tgal
TOTAL YEARLY COSTS $92,052
RECOMMENDED SAVINGS* $21,674 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7211: Clean and maintain refrigerant condensers and towers $3,838 $2,300 $3,838
44,114
kWh
-
02 2.8117: Install sub-metering equipment $2,908 $2,250 $2,908
33,420
kWh
-
03 2.7212: Install or upgrade insulation on hvac distribution systems $1,928 $2,100 $1,928
22,159
kWh
-
04 4.322: Eliminate old stock and modify inventory control $13,000 $25,000 - $13,000
TOTAL RECOMMENDED $21,674 $31,650 $8,674
99,693
kWh
$13,000
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs