ITAC Assessment: SF0329
ITAC logo
ITAC Assessment: SF0329
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Cheese Spreads, Salsa
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 58,000
ft2
Annual Production 8,000,000
lb
Production Hrs. Annual 5,330
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,990 2,094,720
kWh
Electricity Demand $77,449 5,673
kW-mo/yr
Natural Gas $75,180 6,175
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,699 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $13,970 - $13,970
-
kWh
- -
02 2.4133: Use most efficient type of electric motors $2,341 $1,787 $1,702
18,287
kWh
$639
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,474 $1,251 $1,008
10,830
kWh
$466
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,189 $1,218 $739
7,939
kWh
$450
-
kW-mo/yr
-
05 2.1224: Replace boiler $12,638 $18,940 - - $12,638
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $338 $424 $226
2,425
kWh
$112
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $21,116 $33,323 $16,529
133,802
kWh
$4,587
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $633 $945 $459
4,931
kWh
$174
-
kW-mo/yr
-
TOTAL RECOMMENDED $53,699 $57,888 $34,633
178,214
kWh
$6,428
-
kW-mo/yr
$12,638
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs