ITAC Assessment: OR0228
ITAC logo
ITAC Assessment: OR0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product plated parts
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 52
Plant Area 20,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,168
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $180,525 5,339,097
kWh
Natural Gas $36,586 7,661
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,525 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,783

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (haz) Savings Primary Raw Material Savings
01 2.4133: Use most efficient type of electric motors $196 $376 $196
4,396
kWh
- - -
02 2.1224: Replace boiler $3,686 $17,870 - $3,686
-
MMBtu
- -
03 2.2511: Insulate bare equipment $8,136 $32,460 - $8,136
-
MMBtu
- -
04 3.5311: Recover and reuse waste material $2,920 $240 - - - $2,920
05 3.6112: Use filter and drying oven to reduce sludge volume $13,587 $54,901 $(-106.0)
(-2,052)
kWh
$(-907.0)
-
MMBtu
$14,600
-
lb
-
TOTAL RECOMMENDED $28,525 $105,847 $90
2,344
kWh
$10,915
-
MMBtu
$14,600
-
lb
$2,920
TOTAL IMPLEMENTED $13,783 $55,277 $90
2,344
kWh
$(-907.0)
-
MMBtu
$14,600
-
lb
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs