| Assessment Year | 2026 |
|---|---|
| Principal Product | Filter Media |
| NAICS | 321999: All Other Miscellaneous Wood Product Manufacturing |
| SIC | 2499: Wood Products, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 150 |
| Plant Area |
540,000
ft2
|
| Annual Production | 45,519,527
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,453,663 | 15,283,258 |
kWh
|
$0.095 |
| Electricity Demand | $382,408 | 28,932 |
kW-mo/yr
|
$13.22 |
| Electricity Fees | $74,073 | - |
|
- |
| Natural Gas | $2,132,197 | 415,539 |
MMBtu
|
$5.13 |
| Other Gas | $13,965 | 1 |
MMBtu
|
$13,964.68 |
| TOTAL YEARLY COSTS | $4,056,307 | |||
| RECOMMENDED SAVINGS* | $1,910,683 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7224: Reduce space conditioning during non-working hours | $8,247 | $252 | - | - |
$8,247
-
MMBtu
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $23,318 | $2,383 |
$23,318
245,542
kWh
|
- | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,244 | $805 |
$1,560
16,416
kWh
|
$297
-
kW-mo/yr
|
- | $388 | |
| 04 | 2.2136: Install / repair insulation on steam lines | $4,761 | $3,286 | - | - |
$4,761
-
MMBtu
|
- | |
| 05 | 2.7135: Install occupancy sensors | $1,925 | $1,523 |
$1,925
20,261
kWh
|
- | - | - | |
| 06 | 2.2135: Repair and eliminate steam leaks | $114,527 | $100,000 | - | - |
$114,527
-
MMBtu
|
- | |
| 07 | 4.631: Install an uninteruptable power supply | $1,428,571 | $1,420,000 | - | - | - | $1,428,571 | |
| 08 | 2.2414: Use waste heat from hot flue gases to preheat | $322,534 | $422,066 | - | - |
$322,534
-
MMBtu
|
- | |
| 09 | 2.4322: Use or replace with energy efficient substitutes | $371 | $548 |
$200
2,102
kWh
|
$38
-
kW-mo/yr
|
- | $134 | |
| 10 | 2.6211: Conserve energy by efficient use of vending machines | $757 | $1,715 |
$757
7,971
kWh
|
- | - | - | |
| 11 | 2.7232: Replace existing hvac unit with high efficiency model | $3,426 | $29,728 |
$1,078
11,347
kWh
|
- |
$2,348
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $1,910,683 | $1,982,305 |
$28,837
303,640
kWh
|
$335
-
kW-mo/yr
|
$452,418
-
MMBtu
|
$1,429,093 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs