Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

556

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Water supply
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1131 #03 Y:2024 Establish a preventative maintenance program $13,918 $4,200
OK1131 #02 Y:2024 Use solar heat to make electricty $24,450 $138,510
OK1131 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $197 $1,095
LS2416 #04 Y:2024 Upgrade obsolete equipment $6,761 $41,925
LS2416 #03 Y:2024 Use most efficient type of electric motors $1,195 $6,000
LS2416 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,502 $3,171
LS2416 #01 Y:2024 Use less toxic and volatile solvent substitutes $10,355 $550
LS2415 #03 Y:2024 Use solar heat to make electricty $37,687 $514,800
LS2415 #02 Y:2024 Use most efficient type of electric motors $10,098 $41,000
LS2415 #01 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $310,598 $83,380
UU0254 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,182 $5,868
UU0254 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $264 $504
UU0254 #04 Y:2024 Reschedule plant operations or reduce load to avoid peaks $1,472 $2,250
UU0254 #03 Y:2024 Use solar heat to make electricty $509,495 $6,000,000
UU0254 #02 Y:2024 Replace hydraulic / pneumatic equipment with electric equipment $9,712 $81,738
UU0254 #01 Y:2024 Turn off equipment when not in use $1,358 $5,447
UD1073 #03 Y:2023 Use solar heat to make electricty $26,833 $247,333
UD1073 #02 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $27,782 $120,000
UD1073 #01 Y:2023 Install outside air damper / economizer on hvac unit $311 $204
TR0047 #03 Y:2023 Use solar heat to make electricty $62,860 $264,693