Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

586

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Water supply
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1156 #04 Y:2025 Use radiant heater for spot heating $777 $7,189
OK1156 #03 Y:2025 Clean and maintain refrigerant condensers and towers $902 $1,620
OK1156 #02 Y:2025 Use solar heat to make electricty $14,240 $173,394
OK1156 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,540 $2,550
UU0276 #06 Y:2025 Utilize daylight whenever possible in lieu of artificial light $339 $990
UU0276 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $8,440 $14,700
UU0276 #04 Y:2025 Use solar heat to make electricty $28,400 $657,000
UU0276 #03 Y:2025 Modify startup/shutdown times $2,950 $3,600
UU0276 #02 Y:2025 Utilize controls to operate equipment only when needed $20,500 $110,000
UU0276 #01 Y:2025 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $30,600 $110,000
UW2502 #05 Y:2025 Recycle air for heating, ventilation and air conditioning $2,383 $20,158
UW2502 #04 Y:2025 Use solar heat to make electricty $5,248 $31,835
UW2502 #03 Y:2025 Increase efficiency of trucks $10,938 $114,250
UW2502 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $332 $2,872
UW2502 #01 Y:2025 Use proper thickness of insulation on building envelope $2,373 $13,260
SJ0034 #04 Y:2025 Use power during off-peak periods $1,270 -
SJ0034 #03 Y:2025 Use optimum temperature $3,458 -
SJ0034 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $12,631 $10,962
SJ0034 #01 Y:2025 Use solar heat to make electricty $31,541 $106,228
TR0066 #04 Y:2025 Use solar heat to make electricty $110,475 $520,780