ITAC Assessment: OK1156
ITAC logo
ITAC Assessment: OK1156
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Treated potable water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 11
Plant Area 55,000
ft2
Annual Production 2,737,500
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,801 2,521,000
kWh
Electricity Demand $72,587 5,076
kW-mo/yr
Natural Gas $4,598 758
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
Water Disposal $1 1
Tgal
TOTAL YEARLY COSTS $216,988
RECOMMENDED SAVINGS* $17,459 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,540 $2,550 $1,197
21,760
kWh
$343
-
kW-mo/yr
-
02 2.9114: Use solar heat to make electricty $14,240 $173,394 $14,240
258,898
kWh
- -
03 2.7211: Clean and maintain refrigerant condensers and towers $902 $1,620 $902
16,391
kWh
- -
04 2.7231: Use radiant heater for spot heating $777 $5,221 - - $777
-
MMBtu
TOTAL RECOMMENDED $17,459 $182,785 $16,339
297,049
kWh
$343
-
kW-mo/yr
$777
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs