ITAC Assessment: SF0303
ITAC logo
ITAC Assessment: SF0303
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Diced Tomatoes and Tomato Paste
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $100
M
to 500
M
# of Employees 297
Plant Area 1,000,000
ft2
Annual Production 143,000,000
lb
Production Hrs. Annual 3,608
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,719 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,496

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6231: Utilize controls to operate equipment only when needed $8,282 $2,199 $8,282
53,890
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,696 $1,952 $3,723
46,545
kWh
$973
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $2,201 - $1,202
15,027
kWh
$999
-
kW-mo/yr
-
04 2.1113: Reduce combustion air flow to optimum $28,197 $19,158 $4,930
61,639
kWh
$2,396
-
kW-mo/yr
$20,871
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $232 $472 $183
2,284
kWh
$49
-
kW-mo/yr
-
06 2.4133: Use most efficient type of electric motors $8,229 $8,237 $4,359
54,497
kWh
$3,870
-
kW-mo/yr
-
07 2.7134: Use photocell controls $3,343 $11,115 $2,691
33,645
kWh
$652
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,447 $79,682 $17,111
149,760
kWh
$2,336
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $7,092 $39,414 $5,710
71,388
kWh
$1,382
-
kW-mo/yr
-
10 3.1222: Reduce water use with counter current rinsing - $95 - - -
11 3.5315: Lease / purchase baler; sell cardboard to recycler - $10,000 - - -
12 3.6193: Install equipment (eg compactor) to reduce disposal costs - $16,945 - - -
TOTAL RECOMMENDED $81,719 $189,269 $48,191
488,675
kWh
$12,657
-
kW-mo/yr
$20,871
-
MMBtu
TOTAL IMPLEMENTED $56,496 $81,055 $27,004
287,959
kWh
$8,621
-
kW-mo/yr
$20,871
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs