Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Digital Media
NAICS 511110: Newspaper Publishers
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 1,400
Plant Area 1,129,453
ft2
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,544,569 39,392,478
kWh
Electricity Demand $200,591 66,144
kW-mo/yr
Natural Gas $182,508 21,306
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $321,143 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $180,903

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7314: Reduce ventilation air $50,820 $2,200 $50,820
462,000
kWh
02 2.6218: Turn off equipment when not in use $28,083 $1,516 $28,083
255,300
kWh
03 2.7144: Install spectral reflectors / delamp $58,740 $5,580 $58,740
534,000
kWh
04 2.2622: Replace existing chiller with high efficiency model $102,000 $2,375,000 $102,000
930,000
kWh
05 2.7243: Improve air circulation with destratification fans / other methods $81,500 $11,200 $81,500
741,000
kWh
TOTAL RECOMMENDED $321,143 $2,395,496 $321,143
2,922,300
kWh
TOTAL IMPLEMENTED $180,903 $2,378,716 $180,903
1,647,300
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs