ITAC Assessment: OR0813
ITAC logo
ITAC Assessment: OR0813
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Freshwater
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $50
M
to 100
M
# of Employees 9
Plant Area 280,000
ft2
Annual Production 2,400,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,635 2,759,120
kWh
Electricity Demand $50,791 6,194
kW-mo/yr
Electricity Fees $8,477 -
Natural Gas $5,728 708
MMBtu
Waste Disposal Costs
Water Usage $1 2,400,000
Tgal
TOTAL YEARLY COSTS $332,631
RECOMMENDED SAVINGS* $491,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.9121: Install wind powered electric generator $9,337 - $9,337
96,321
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $975 - - $975
-
MMBtu
03 2.9114: Use solar heat to make electricty $235,069 $1,842,000 $235,069
2,423,388
kWh
-
04 2.3322: Use existing dam to generate electricity $246,419 $3,804,000 $246,419
2,540,400
kWh
-
TOTAL RECOMMENDED $491,800 $5,646,000 $490,825
5,060,109
kWh
$975
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs