ITAC Assessment: IC0130
ITAC logo
ITAC Assessment: IC0130
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Architectural Glass
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 87,150
ft2
Annual Production 260
thousand feet
Production Hrs. Annual 6,552
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,799 711,858
kWh
Electricity Demand $25,008 4,322
kW-mo/yr
Natural Gas $124,177 10,853
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,702 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.5111: Convert from indirect to direct fired systems $12,768 $40,352 - - $12,768
-
MMBtu
- - -
02 2.2136: Install / repair insulation on steam lines $1,486 $1,890 - - $1,486
-
MMBtu
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,652 $21,323 $2,600
38,239
kWh
$846
-
kW-mo/yr
- $67 - $139
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,983 $790 $1,937
28,490
kWh
$46
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,094 $1,096 $803
11,806
kWh
$261
-
kW-mo/yr
- - - $30
06 2.7142: Utilize higher efficiency lamps and/or ballasts $36 $128 $19
273
kWh
$11
-
kW-mo/yr
- $13 - $(-7.0)
07 2.4322: Use or replace with energy efficient substitutes $2,363 $231 $1,871
27,504
kWh
$492
-
kW-mo/yr
- - - -
08 2.4323: Use optimum size and capacity equipment $1,216 $5,830 $1,216
17,888
kWh
- - - - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $499 $684 $499
7,340
kWh
- - - - -
10 2.4133: Use most efficient type of electric motors $2,396 $8,878 $1,875
27,571
kWh
$521
-
kW-mo/yr
- - - -
11 2.8114: Change rate schedules or other changes in utility service $6,209 - - - - - $6,209 -
TOTAL RECOMMENDED $33,702 $81,202 $10,820
159,111
kWh
$2,177
-
kW-mo/yr
$14,254
-
MMBtu
$80 $6,209 $162
TOTAL IMPLEMENTED - - - - - - - -