ITAC Assessment: BS0027
ITAC logo
ITAC Assessment: BS0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 3,852,980
ft2
Annual Production 94,000,000
thousand feet
Production Hrs. Annual 3,416
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $698,506 13,984,026
kWh
Electricity Demand $21,697 5,166
kW-mo/yr
Wood $1,105,000 747,130
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,874 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,041

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Water Consumption Savings
01 2.1331: Burn a less expensive grade of fuel $40,833 $51,377 - $40,833
-
MMBtu
-
02 2.6212: Turn off equipment during breaks, reduce operating time $10,592 $3,814 $10,592
211,831
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $487 $168 $487
9,743
kWh
- -
04 2.2511: Insulate bare equipment $253 $12,282 - $253
-
MMBtu
-
05 2.2113: Repair or replace steam traps $37,433 $17,740 - $8,781
-
MMBtu
$28,652
-
Tgal
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,276 $320 $6,276
125,266
kWh
- -
TOTAL RECOMMENDED $95,874 $85,701 $17,355
346,840
kWh
$49,867
-
MMBtu
$28,652
-
Tgal
TOTAL IMPLEMENTED $55,041 $34,324 $17,355
346,840
kWh
$9,034
-
MMBtu
$28,652
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs