ITAC Assessment: OK0963
ITAC logo
ITAC Assessment: OK0963
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Aeronautical electronic systems
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 36,000
ft2
Annual Production 90,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,437 1,711,624
kWh
Natural Gas $3,508 598
MMBtu
TOTAL YEARLY COSTS $185,945
RECOMMENDED SAVINGS* $44,117 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,325

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,783 $62,981 $18,783
175,539
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,310 $5,608 $3,310
30,932
kWh
-
03 2.7232: Replace existing hvac unit with high efficiency model $11,937 $38,220 $11,937
111,559
kWh
-
04 2.7241: Install outside air damper / economizer on hvac unit $5,699 $12,090 $5,699
53,264
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $272 - $272
2,540
kWh
-
06 2.2443: Re-use or recycle hot or cold process exhaust air $4,116 $1,182 $3,494
32,653
kWh
$622
-
MMBtu
TOTAL RECOMMENDED $44,117 $120,081 $43,495
406,487
kWh
$622
-
MMBtu
TOTAL IMPLEMENTED $16,325 $39,402 $15,703
146,752
kWh
$622
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs