Assessment Year | 2025 |
---|---|
Principal Product | Treated Groundwater |
NAICS | 221310: Water Supply and Irrigation Systems |
SIC | 4941: Water Supply |
Sales Range | $1 M to 5M |
# of Employees | 5 |
Plant Area |
11,000
ft2
|
Annual Production | 990,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $115,820 | 2,407,893 |
kWh
|
$0.048 |
Electricity Demand | $37,298 | 4,572 |
kW-mo/yr
|
$8.16 |
Electricity Fees | $24,773 | - |
|
- |
TOTAL YEARLY COSTS | $177,891 | |||
RECOMMENDED SAVINGS* | $91,229 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $30,600 | $110,000 |
$25,364
528,000
kWh
|
$7,636
-
kW-mo/yr
|
$(-2,400.0) | |
02 | 2.6231: Utilize controls to operate equipment only when needed | $20,500 | $110,000 |
$17,773
369,000
kWh
|
$5,727
-
kW-mo/yr
|
$(-3,000.0) | |
03 | 4.454: Modify startup/shutdown times | $2,950 | $3,600 |
$(-140.0)
(-2,900)
kWh
|
$5,490
-
kW-mo/yr
|
$(-2,400.0) | |
04 | 2.9114: Use solar heat to make electricty | $28,400 | $657,000 |
$28,400
447,000
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,440 | $14,700 |
$6,588
137,000
kWh
|
$1,852
-
kW-mo/yr
|
- | |
06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $339 | $990 |
$339
9,690
kWh
|
- | - | |
TOTAL RECOMMENDED | $91,229 | $896,290 |
$78,324
1,487,790
kWh
|
$20,705
-
kW-mo/yr
|
$(-7,800.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs