ITAC Assessment: MI0480
ITAC logo
ITAC Assessment: MI0480
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2027
Principal Product Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 152,000
ft2
Annual Production 2,463,750
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,270 3,344,280
kWh
Electricity Demand $122,312 9,874
kW-mo/yr
Electricity Fees $31,508 -
TOTAL YEARLY COSTS $315,090
RECOMMENDED SAVINGS* $32,884 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7229: Air condition only space necessary $3,979 - $2,938
61,200
kWh
$1,041
-
kW-mo/yr
02 2.7221: Lower temperature during the winter season and vice-versa $4,186 - $1,910
39,798
kWh
$2,276
-
kW-mo/yr
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $12,231 - - $12,231
-
kW-mo/yr
04 2.6218: Turn off equipment when not in use $10,324 $2,600 $10,324
215,086
kWh
-
05 2.7135: Install occupancy sensors $599 $1,230 $599
12,470
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,565 $4,700 $714
14,884
kWh
$851
-
kW-mo/yr
TOTAL RECOMMENDED $32,884 $8,530 $16,485
343,438
kWh
$16,399
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs