| Assessment Year | 2026 |
|---|---|
| Principal Product | Distilled spirits |
| NAICS | 312140: Distilleries |
| SIC | 2085: Distilled and Blended Liquors |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
776,000
ft2
|
| Annual Production | 6,000
Tgal
|
| Production Hrs. Annual | 7,728
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $479,869 | 17,083,800 |
kWh
|
$0.028 | |
| Electricity Demand | $761,236 | 33,833 |
kW-mo/yr
|
$22.50 | |
| Electricity Fees | $114,368 | - |
|
- | |
| Natural Gas | $1,097,037 | 279,013 |
MMBtu
|
$3.93 | |
| Other Gas | $363,298 | 1 |
MMBtu
|
$363,298.00 | |
| Waste Disposal Costs | |||||
| Water Usage | $44,877 | 6,629 |
Tgal
|
$6.77 | |
| TOTAL YEARLY COSTS | $2,860,685 | ||||
| RECOMMENDED SAVINGS* | $304,280 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,992 | $1,155 |
$1,992
70,882
kWh
|
- | - | - | |
| 02 | 2.2437: Recover waste heat from equipment | $5,474 | $13,000 | - | - |
$5,474
-
MMBtu
|
- | |
| 03 | 2.2136: Install / repair insulation on steam lines | $5,070 | $3,340 | - | - |
$5,070
-
MMBtu
|
- | |
| 04 | 2.2121: Increase amount of condensate returned | $28,057 | $40,600 | - | - |
$16,201
-
MMBtu
|
$11,856
-
Tgal
|
|
| 05 | 2.9114: Use solar heat to make electricty | $26,708 | $193,418 |
$15,417
548,417
kWh
|
$11,291
-
kW-mo/yr
|
- | - | |
| 06 | 2.2692: Use outside cold water source as a supply of cooling water | $236,979 | $474,400 |
$236,979
8,433,301
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $304,280 | $725,913 |
$254,388
9,052,600
kWh
|
$11,291
-
kW-mo/yr
|
$26,745
-
MMBtu
|
$11,856
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs