ITAC Assessment: OK0285
ITAC logo
ITAC Assessment: OK0285
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product MOTION & SLEEP MECHANISM
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 24,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,543 3,728,898
kWh
Natural Gas $85,549 28,187
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,520 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,520

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,402 $3,870 $1,741
53,341
kWh
- $(-339.0)
02 2.4133: Use most efficient type of electric motors $486 $872 $486
14,947
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,367 - $1,467
59,496
kWh
- $(-100.0)
04 2.2437: Recover waste heat from equipment $7,072 $98 - $7,072
-
MMBtu
-
05 2.2511: Insulate bare equipment $2,244 $1,161 - $2,244
-
MMBtu
-
06 2.3511: Use plant owned transformers or lease transformers $13,643 $31,400 $13,643
(-10,844)
kWh
- -
07 2.2449: Recover heat from exhausted steam, hot air or hot water $4,306 $390 - $4,306
-
MMBtu
-
TOTAL RECOMMENDED $30,520 $37,791 $17,337
116,940
kWh
$13,622
-
MMBtu
$(-439.0)
TOTAL IMPLEMENTED $30,520 $37,791 $17,337
116,940
kWh
$13,622
-
MMBtu
$(-439.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs