Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product BLOW-MOLDED CONTAINERS
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 97
Plant Area
n/a
Annual Production 56,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $433,345 8,403,869
kWh
Natural Gas $20,197 4,671
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,432 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,343

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $31,568 $41,000 $31,568
-
kWh
-
02 2.3511: Use plant owned transformers or lease transformers $15,864 $22,000 $15,864
-
kWh
-
03 2.6121: Reduce hot water temperature to the minimum required $11,343 $3,000 $11,343
168,230
kWh
-
04 2.7261: Install timers and/or thermostats $2,400 $800 - $2,400
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,257 $23,650 $10,527
236,811
kWh
$(-1,270.0)
-
MMBtu
TOTAL RECOMMENDED $70,432 $90,450 $69,302
405,041
kWh
$1,130
-
MMBtu
TOTAL IMPLEMENTED $11,343 $3,000 $11,343
168,230
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs