ITAC Assessment: TR0074
ITAC logo
ITAC Assessment: TR0074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area 60,000
ft2
Annual Production 2,555,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,211 2,603,193
kWh
Electricity Demand $67,614 5,195
kW-mo/yr
Electricity Fees $7,000 -
TOTAL YEARLY COSTS $208,825
RECOMMENDED SAVINGS* $56,237 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $45,766 $152,797 $30,434
590,301
kWh
$15,332
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,083 $3,744 $1,972
38,250
kWh
$111
-
kW-mo/yr
03 2.4322: Use or replace with energy efficient substitutes $8,388 $25,346 $6,233
120,888
kWh
$2,155
-
kW-mo/yr
TOTAL RECOMMENDED $56,237 $181,887 $38,639
749,439
kWh
$17,598
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs