ITAC Assessment: AM0527
ITAC logo
ITAC Assessment: AM0527
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Soft drinks
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 333
Plant Area 660,000
ft2
Annual Production 113,000
Tgal
Production Hrs. Annual 8,520
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,739,954 34,733,184
kWh
Electricity Demand $398,860 65,592
kW-mo/yr
Natural Gas $1,499,154 195,576
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,097 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $82,493

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $33,106 $56,785 - $33,106
-
kW-mo/yr
- -
02 4.821: Pay bills on time to avoid late fees $28,915 - - - - $28,915
03 2.7135: Install occupancy sensors $19,815 $27,489 $18,327
200,460
kWh
$1,488
-
kW-mo/yr
- -
04 2.3132: Recharge batteries on during off-peak demand periods $6,604 - - $6,604
-
kW-mo/yr
- -
05 2.7134: Use photocell controls $200 $22 $168
2,008
kWh
$32
-
kW-mo/yr
- -
06 2.2511: Insulate bare equipment $457 $28 $330
3,270
kWh
$60
-
kW-mo/yr
$67
-
MMBtu
-
TOTAL RECOMMENDED $89,097 $84,324 $18,825
205,738
kWh
$41,290
-
kW-mo/yr
$67
-
MMBtu
$28,915
TOTAL IMPLEMENTED $82,493 $84,324 $18,825
205,738
kWh
$34,686
-
kW-mo/yr
$67
-
MMBtu
$28,915
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs