257
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Optical instruments and lenses | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0753 #03 Y:2015 | 03 | 2015 | Reduce ventilation air | $4,632 | $6,000 | |
| MA0753 #02 Y:2015 | 02 | 2015 | Reduce ventilation air | $7,290 | $5,575 | |
| MA0753 #01 Y:2015 | 01 | 2015 | Replace electrically-operated equipment with fossil fuel equipment | $18,534 | $67,200 | |
| CO0697 #06 Y:2014 | 06 | 2014 | Utilize higher efficiency lamps and/or ballasts | $1,440 | $5,180 | |
| CO0697 #05 Y:2014 | 05 | 2014 | Apply for tax-free status for energy purchases | $4,000 | $500 | |
| CO0697 #04 Y:2014 | 04 | 2014 | Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $8,560 | $38,890 | |
| CO0697 #03 Y:2014 | 03 | 2014 | Use solar heat to make electricty | $13,090 | $87,610 | |
| CO0697 #02 Y:2014 | 02 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,760 | $1,550 | |
| CO0697 #01 Y:2014 | 01 | 2014 | Replace existing chiller with high efficiency model | $23,320 | $29,550 | |
| SF0449 #06 Y:2014 | 06 | 2014 | Install occupancy sensors | $2,997 | $14,024 | |
| SF0449 #05 Y:2014 | 05 | 2014 | Utilize higher efficiency lamps and/or ballasts | $12,630 | $27,842 | |
| SF0449 #04 Y:2014 | 04 | 2014 | Use computer programs to optimize hvac performance | $28,600 | $42,672 | |
| SF0449 #03 Y:2014 | 03 | 2014 | Conserve energy by efficient use of vending machines | $317 | $307 | |
| SF0449 #02 Y:2014 | 02 | 2014 | Replace electrically-operated equipment with fossil fuel equipment | $10,804 | $9,262 | |
| SF0449 #01 Y:2014 | 01 | 2014 | Install spectral reflectors / delamp | $660 | $280 | |
| CO0682 #04 Y:2013 | 04 | 2013 | Install occupancy sensors | $1,250 | $1,240 | |
| CO0682 #03 Y:2013 | 03 | 2013 | Utilize higher efficiency lamps and/or ballasts | $4,860 | $5,750 | |
| CO0682 #02 Y:2013 | 02 | 2013 | Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $42,490 | $93,580 | |
| CO0682 #01 Y:2013 | 01 | 2013 | Recover waste heat from equipment | $4,080 | $9,950 | |
| MA0708 #04 Y:2013 | 04 | 2013 | Reduce the pressure of compressed air to the minimum required | $1,828 | $3,200 |