ITAC Assessment: MA0753
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product High precision optical glass
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3827: Optical Instruments and Lenses
Sales Range $10
M
to 50
M
# of Employees 141
Plant Area 85,500
ft2
Annual Production 72,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $470,788 4,736,200
kWh
Electricity Demand $85,640 12,373
kW-mo/yr
Electricity Fees $(-559.0) -
Natural Gas $40,017 6,156
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,132 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,756

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $18,534 $67,200 $19,600
197,184
kWh
$2,623
-
kW-mo/yr
$(-3,689.0)
-
MMBtu
02 2.7314: Reduce ventilation air $7,290 $5,575 $4,528
45,549
kWh
- $2,762
-
MMBtu
03 2.7314: Reduce ventilation air $4,632 $6,000 $4,632
46,604
kWh
- -
04 2.7135: Install occupancy sensors $1,608 $4,608 $1,608
16,174
kWh
- -
05 2.2511: Insulate bare equipment $1,226 $1,400 $1,226
12,333
kWh
- -
06 2.7491: Insulate glazing, walls, ceilings, and roofs $842 $2,152 - - $842
-
MMBtu
TOTAL RECOMMENDED $34,132 $86,935 $31,594
317,844
kWh
$2,623
-
kW-mo/yr
$(-85.0)
-
MMBtu
TOTAL IMPLEMENTED $14,756 $17,583 $11,994
120,660
kWh
- $2,762
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs