Assessment Year | 2015 |
---|---|
Principal Product | High precision optical glass |
NAICS | 327215: Glass Product Manufacturing Made of Purchased Glass |
SIC | 3827: Optical Instruments and Lenses |
Sales Range | $10 M to 50M |
# of Employees | 141 |
Plant Area |
85,500
ft2
|
Annual Production | 72,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $470,788 | 4,736,200 |
kWh
|
$0.099 |
Electricity Demand | $85,640 | 12,373 |
kW-mo/yr
|
$6.92 |
Electricity Fees | $(-559.0) | - |
|
- |
Natural Gas | $40,017 | 6,156 |
MMBtu
|
$6.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,132 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,756 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $18,534 | $67,200 |
$19,600
197,184
kWh
|
$2,623
-
kW-mo/yr
|
$(-3,689.0)
-
MMBtu
|
|
02 | 2.7314: Reduce ventilation air | $7,290 | $5,575 |
$4,528
45,549
kWh
|
- |
$2,762
-
MMBtu
|
|
03 | 2.7314: Reduce ventilation air | $4,632 | $6,000 |
$4,632
46,604
kWh
|
- | - | |
04 | 2.7135: Install occupancy sensors | $1,608 | $4,608 |
$1,608
16,174
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $1,226 | $1,400 |
$1,226
12,333
kWh
|
- | - | |
06 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $842 | $2,152 | - | - |
$842
-
MMBtu
|
|
TOTAL RECOMMENDED | $34,132 | $86,935 |
$31,594
317,844
kWh
|
$2,623
-
kW-mo/yr
|
$(-85.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,756 | $17,583 |
$11,994
120,660
kWh
|
- |
$2,762
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs