ITAC Assessment: CO0682
ITAC logo
ITAC Assessment: CO0682
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Optical Instruments
NAICS 333314: Optical Instrument and Lens Manufacturing
SIC 3827: Optical Instruments and Lenses
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 110,000
ft2
Annual Production 180,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $408,906 9,777,375
kWh
Electricity Demand $364,363 17,640
kW-mo/yr
Electricity Fees $605 -
Natural Gas $25,147 4,025
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,680 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $4,080 $9,950 - - $4,080
-
MMBtu
- -
02 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $42,490 $93,580 $14,550
317,100
kWh
$24,280
-
kW-mo/yr
$3,660
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,860 $5,750 $1,910
41,600
kWh
$1,870
-
kW-mo/yr
- $160 $920
04 2.7135: Install occupancy sensors $1,250 $1,240 $1,040
22,600
kWh
- - $30 $180
TOTAL RECOMMENDED $52,680 $110,520 $17,500
381,300
kWh
$26,150
-
kW-mo/yr
$7,740
-
MMBtu
$190 $1,100
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs