Assessment Year | 2014 |
---|---|
Principal Product | Optical Instruments |
NAICS | 333314: Optical Instrument and Lens Manufacturing |
SIC | 3827: Optical Instruments and Lenses |
Sales Range | $10 M to 50M |
# of Employees | 230 |
Plant Area |
110,000
ft2
|
Annual Production | 180,000
pieces
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $408,906 | 9,777,375 |
kWh
|
$0.042 |
Electricity Demand | $364,363 | 17,640 |
kW-mo/yr
|
$20.66 |
Electricity Fees | $605 | - |
|
- |
Natural Gas | $25,147 | 4,025 |
MMBtu
|
$6.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,680 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $4,080 | $9,950 | - | - |
$4,080
-
MMBtu
|
- | - | |
02 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $42,490 | $93,580 |
$14,550
317,100
kWh
|
$24,280
-
kW-mo/yr
|
$3,660
-
MMBtu
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,860 | $5,750 |
$1,910
41,600
kWh
|
$1,870
-
kW-mo/yr
|
- | $160 | $920 | |
04 | 2.7135: Install occupancy sensors | $1,250 | $1,240 |
$1,040
22,600
kWh
|
- | - | $30 | $180 | |
TOTAL RECOMMENDED | $52,680 | $110,520 |
$17,500
381,300
kWh
|
$26,150
-
kW-mo/yr
|
$7,740
-
MMBtu
|
$190 | $1,100 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs