ITAC Assessment: TN0251
ITAC logo
ITAC Assessment: TN0251
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product UPHOLSTERED FURNITURE
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 55,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,593 1,376,612
kWh
Natural Gas $50,761 9,148
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,499 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,544

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $23,955 $205 $1,966
32,239
kWh
$21,989
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,204 $300 $6,204
101,700
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $340 - $340
5,569
kWh
-
TOTAL RECOMMENDED $30,499 $505 $8,510
139,508
kWh
$21,989
-
MMBtu
TOTAL IMPLEMENTED $6,544 $300 $6,544
107,269
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs