ITAC Assessment: NC0171
ITAC logo
ITAC Assessment: NC0171
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Office partition paneling fabric
NAICS
n/a
SIC 2399: Fabricated Textile Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 98,000
ft2
Annual Production 1,500
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,814 5,368,699
kWh
Electricity Demand $90,904 10,790
kW-mo/yr
Electricity Fees $7,856 -
Natural Gas $427,633 85,272
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $276,922 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,536

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings Primary Product Savings
01 2.1133: Adjust burners for efficient operation $1,107 $800 - - $607
-
MMBtu
- - $500 - -
02 2.1133: Adjust burners for efficient operation $35,782 $800 - - $35,782
-
MMBtu
- - - - -
03 2.2437: Recover waste heat from equipment $4,918 $4,000 - - $4,918
-
MMBtu
- - - - -
04 2.2511: Insulate bare equipment $877 $300 - - $877
-
MMBtu
- - - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $852 $10 $548
18,171
kWh
$304
-
kW-mo/yr
- - - - - -
06 3.5313: Increase amount of waste recovered for resale $213 $400 - - - $213
-
lb
- - - -
07 4.122: Develop standard procedures to improve internal yields $90,000 $7,500 - - - - - - - $90,000
08 4.125: $143,173 $137,600 - - $48,333
-
MMBtu
- $57,240 - $37,600
-
Tgal
-
TOTAL RECOMMENDED $276,922 $151,410 $548
18,171
kWh
$304
-
kW-mo/yr
$90,517
-
MMBtu
$213
-
lb
$57,240 $500 $37,600
-
Tgal
$90,000
TOTAL IMPLEMENTED $43,536 $5,910 $548
18,171
kWh
$304
-
kW-mo/yr
$42,184
-
MMBtu
- - $500 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs