ITAC Assessment: LS1902
ITAC logo
ITAC Assessment: LS1902
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Magnetic Sensing Equipment
NAICS 334519: Other Measuring and Controlling Device Manufacturing
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 50,000
ft2
Annual Production 6,286
units
Production Hrs. Annual 3,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,117 916,000
kWh
Electricity Demand $13,926 3,380
kW-mo/yr
Other Gas $129,332 25,000
MMBtu
Waste Disposal Costs
Water Usage $3,002 444
Tgal
TOTAL YEARLY COSTS $209,377
RECOMMENDED SAVINGS* $12,452 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,699

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6231: Utilize controls to operate equipment only when needed $7,438 $375 $7,438
107,800
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $743 $50 $743
10,779
kWh
-
03 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $1,699 $100 $1,699
24,633
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $80 $70 $80
1,163
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,492 $4,720 $2,443
35,400
kWh
$49
-
kW-mo/yr
TOTAL RECOMMENDED $12,452 $5,315 $12,403
179,775
kWh
$49
-
kW-mo/yr
TOTAL IMPLEMENTED $1,699 $100 $1,699
24,633
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs