ITAC Assessment: LL0136
ITAC logo
ITAC Assessment: LL0136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Newspapers
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 48,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,177 2,971,360
kWh
Electricity Demand $36,336 7,267
kW-mo/yr
Electricity Fees $7,501 -
Natural Gas $2,580 2,617
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,009 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,239

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.3212: Optimize plant power factor $10,620 $15,435 - $10,212
-
kW-mo/yr
$408 - -
02 2.7111: Reduce illumination to minimum necessary levels $5,546 - $4,864
95,607
kWh
$469
-
kW-mo/yr
$213 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,800 $1,080 $3,654
71,818
kWh
- $146 - -
04 2.7111: Reduce illumination to minimum necessary levels $2,311 - $2,027
39,836
kWh
$195
-
kW-mo/yr
$89 - -
05 2.7243: Improve air circulation with destratification fans / other methods $2,079 $2,307 $1,999
39,281
kWh
- $80 - -
06 2.7134: Use photocell controls $1,293 $260 $1,163
22,854
kWh
$80
-
kW-mo/yr
$50 - -
07 4.611: Begin a practice of predictive / preventative maintenance $1,505 $2,255 - - - - $1,505
08 3.5313: Increase amount of waste recovered for resale $3,855 - - - - $3,855
-
lb
-
TOTAL RECOMMENDED $31,009 $21,337 $13,707
269,396
kWh
$10,956
-
kW-mo/yr
$986 $3,855
-
lb
$1,505
TOTAL IMPLEMENTED $11,239 $5,642 $5,653
111,099
kWh
- $226 $3,855
-
lb
$1,505
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs